The contractors are done with the building and the electrical installation, which were the only two components of the garage. Now we have to wait for two inspections, and the power company to hook up the power to the garage.
Also we need to put some gravel in front of the garage door to bring the driveway level up to the foundation. It will make driving in less bumpy. 🙂
Would you believe a sidewalk is what started this whole project? We really want one for winter snow and ice conditions as it is much easier to keep it free from both snow and nice than it is bare ground. Less hazardous to our health if we do things that will let us avoid falling.
So there are things yet to do but it’s stuff we can do, rather than contractors. Yay! Mishkin is going to be so happy not to have strangers lurking around and banging on his house since he can’t keep his servants from allowing interlopers. Badly trained humans.
Watched a baby hummingbird taking a bath in the bird bath this morning. Funny that the adults don’t do that, just the babies. They hang out on the side of the bath where the water escapes and making a tiny waterfall, and they flutter their wings to throw up a cloud of water drops. So cute!!
P.S. Barry LOVES reading about our garage. 😀