Feed on
Posts
Comments

September renovations

We finally finished the painting and most of the woodwork in the house; the only room we haven’t done anything with yet is our bedroom. That will be next but this week we get to play instead of work.

Old paint color on the right side of the beam at the top of the door, a grey color that made the house seem cold and somewhat dark. The new color is on the left side of the doorway and beam.

It was so nice to take down the stupid shelving the former owners had scattered around the walls, above windows for the most part, which served no useful purpose other than collecting dust and annoying my sense of style. We had tons of holes in the walls to fix as the shelving was in hollow wall anchors instead of being screwed into studs; they couldn’t take any weight on the shelves themselves without detaching from the walls and dumping everything on the floor.

Then Dan took down the paddle fan in the living room and replaced it with a much brighter light which will be perfect for knitting. Both those changes make the ceilings seem higher and the rooms feel more spacious.

The living room was tough to paint because we had to move so much furniture and use lots and lots of masking tape.

I repainted the wood boards surrounding the rock where our pellet stove sits. I really like that color better than white; that looked like they primed it and forgot to paint it – more of their industrial loft concept in decor.

We replaced the 1×4 pine boards which were painted white with normal wood mouldings around the door and floor.

Most of the woodwork is done, the hardest part anyway which was around all the doors. We had to stop doing that because we ran out of varnished boards. I still have ten of them left to varnish and I’ll take care of that this week.

Even with lights out, the rooms feel lighter.

The hallway was hard to paint because there was so much stuff in the way of the walls which could not be moved.
The bathroom is now completely finished. Well except for replacing the toilet for one that isn’t white. Someday. We need to find a plumber for that task.

So yay! Finished with the bulk of renovations. Just one room to go and we can rest on our laurels.

Leave a Reply