Feed on
Posts
Comments

Tile work is done!

Getting closer to being able to take a shower. Hurray!

Lots of grout work yet to be done, and then caulking the corners and around the walls at the floor level. And no caulk at the moment. Sigh.

Lots of grout work yet to be done, and then caulking the corners and around the walls at the floor level. And no caulk at the moment. Sigh.  Didn’t know we needed a special type of sanded caulk, or we would have gotten it ahead of time.

The snow stopped as well, and it has warmed up to 14.5F above zero.  Amazing how much less firewood we need to heat the house at this temperature instead of -10F.  You can see how snowy the branches are in the window above the shower.

One Response to “Tile work is done!”

  1. Laura Kidd says:

    Good Morning. That looks so nice and love the window above the shower. Was that there before you remodeled?

Leave a Reply